Spill Prevention Control and Countermeasure Plans

Colorado, Wyoming, Oklahoma and Texas Refineries

Evaluated each facility for applicability and performed a gap analysis on existing plans. Used site-specific observations, measurements, maps and other documentation to address SPCC requirements. Planning distances were calculated and documented. Inspection forms, procedures and response plans were prepared based upon facility practices. SPCC plans were written to meet all new requirements while minimizing unnecessary paperwork and procedures. CADD drawings were prepared or revised to support the projects.

404 Permitting for Corrective Action Project
Avetta
ACEC
DISA
ISNetwork