Texas Refinery
Prepared a FMP to comply with the final Standards of Performance for Petroleum Refineries (NSPS Subpart Ja). The plan provides the specifications of the flare system, documents applicability with the requirements of the regulation and outlines a compliance strategy, and included devising the best compliance strategy, calculating a baseline flare flow rate, drafting the flare gas recovery system procedures and working with process control engineers to meet flare flow monitoring requirements.